← All use cases
ASIE Lite · Pharmacovigilance and Drug Safety
Signal Triage Backlog
Decide how to clear a 240-case signal-triage backlog before a GVP inspection in six weeks without weakening medical review.
SYNTHETIC DATA · EDUCATIONAL ONLY · NOT CLINICAL, LEGAL OR REGULATORY ADVICE
01Intent
Decision owner: Vice President, Drug Safety
- ⚠ Blocker: Two safety databases have not reconciled for the last quarter
- ⚠ Blocker: Medical review capacity is 40% below the triage queue arrival rate
02Evidence
| ID | Record | Source | Date | Confidence | |
|---|---|---|---|---|---|
| PV-01 | Triage queue ageing report SYNTHETIC | Argus | 2026-10-30 | 85% | |
| PV-02 | ICSR reconciliation summary SYNTHETIC | Veeva Vault Safety | 2026-09-30 | 55% | |
| PV-03 | Signal detection run output SYNTHETIC | ARISg | 2026-10-21 | 70% | |
| PV-04 | Medical reviewer capacity data SYNTHETIC | Workday | 2026-10-28 | 75% | |
| PV-05 | Periodic report submission calendar SYNTHETIC | Veeva Vault Safety | 2026-10-15 | 80% | |
| PV-06 | Prior inspection findings log SYNTHETIC | QMS | 2025-11-04 | 60% | |
| PV-07 | Vendor triage service-level report SYNTHETIC | Vendor portal | 2026-10-10 | 45% |
0 missing record(s) — each reduces evidence quality by 10 points on every option.
03Scenarios & value
score = 0.35·urgency + 0.25·impact + 0.2·evidence + 0.2·feasibility · scenario v1
Option ALEADING
Surge vendor capacity for 60 days
Outsource 150 cases to a qualified provider
72.3 ±9
Option B
Pause non-critical signal work, redeploy internally
Protect inspection scope, defer benefit work
67.8 ±5
Option C
Risk-rank and clear inspection-relevant cases only
Focused clearance, backlog persists afterwards
69 ±4
04Governance & approval
Leading recommendation: Surge vendor capacity for 60 days (72.3 ±9)